Menu Close

A-drum-of-mass-100g-is-rolled-into-the-deck-of-a-lorry-1-5m-above-a-horizontal-floor-using-a-plank-4m-long-calculate-the-workdone-against-gravity-during-the-process-g-10m-s-2-




Question Number 12611 by tawa last updated on 26/Apr/17
A drum of mass 100g is rolled into the deck of a lorry 1.5m above a   horizontal floor using a plank 4m long. calculate the workdone against  gravity during the process. (g = 10m/s^2 ).
Adrumofmass100gisrolledintothedeckofalorry1.5maboveahorizontalfloorusingaplank4mlong.calculatetheworkdoneagainstgravityduringtheprocess.(g=10m/s2).
Answered by mrW1 last updated on 27/Apr/17
W=mgh=0.1×10×1.5=1.5 J
W=mgh=0.1×10×1.5=1.5J
Commented by tawa last updated on 27/Apr/17
God bless you sir.
Godblessyousir.

Leave a Reply

Your email address will not be published. Required fields are marked *